ITAC Assessment: CO0214
ITAC logo
ITAC Assessment: CO0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PLASTIC BAGS & TUBING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 250,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,886 931,419
kWh
Natural Gas $8,701 2,327
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,270 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,100 $5,700 $4,100
63,892
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $769 $280 $769
12,016
kWh
03 2.4221: Install compressor air intakes in coolest locations $479 $200 $479
7,327
kWh
04 2.6231: Utilize controls to operate equipment only when needed $922 $2,575 $922
14,361
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,050 $25,000 $8,050
125,147
kWh
06 2.7226: Use computer programs to optimize hvac performance $950 $6,500 $950
31,360
kWh
TOTAL RECOMMENDED $15,270 $40,255 $15,270
254,103
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs