Assessment Year | 1991 |
---|---|
Principal Product | BAKE MIXES, SHORTENINGS |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $290,917 | 7,201,934 |
kWh
|
$0.040 |
Natural Gas | $291,015 | 97,556 |
MMBtu
|
$2.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,955 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $86,955 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $31,100 | - | - |
$14,100
-
MMBtu
|
$17,000 | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $16,000 | $3,800 |
$16,000
643,025
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,165 | $7,200 |
$5,584
144,197
kWh
|
$3,581
-
MMBtu
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $6,600 | $16,000 | - |
$6,600
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,200 | $2,400 |
$6,200
154,455
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $750 | $1,400 |
$750
18,757
kWh
|
- | - | |
07 | 2.2447: Heat water with exhaust heat | $4,300 | $11,000 | - |
$4,300
-
MMBtu
|
- | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,400 | $2,000 | - |
$4,400
-
MMBtu
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,700 | $5,600 |
$2,700
67,702
kWh
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $1,000 | $700 |
$1,000
25,791
kWh
|
- | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $400 | $1,500 |
$400
16,413
kWh
|
- | - | |
12 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $840 | $1,300 |
$840
20,809
kWh
|
- | - | |
13 | 2.7261: Install timers and/or thermostats | $660 | $900 |
$120
4,982
kWh
|
$540
-
MMBtu
|
- | |
14 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $540 | $200 |
$540
13,482
kWh
|
- | - | |
15 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,000 | $1,700 | - |
$1,000
-
MMBtu
|
- | |
16 | 2.2511: Insulate bare equipment | $1,300 | $1,800 | - |
$1,300
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $86,955 | $57,500 |
$34,134
1,109,613
kWh
|
$35,821
-
MMBtu
|
$17,000 | ||
TOTAL IMPLEMENTED | $86,955 | $57,500 |
$34,134
1,109,613
kWh
|
$35,821
-
MMBtu
|
$17,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs