ITAC Assessment: CO0175
ITAC logo
ITAC Assessment: CO0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SEATS FOR AEROSPACE INDDUSTRY
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,200
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,568 3,281,067
kWh
Natural Gas $74,224 18,441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,217 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,502

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7441: Replace broken windows and/or window sash $12,000 $15,000 - $12,000
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,835 $1,774 $2,835
60,961
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,230 $5,800 $1,230
26,377
kWh
-
04 2.8121: Apply for tax-free status for energy purchases $3,950 $200 - $3,950
-
MMBtu
05 2.7261: Install timers and/or thermostats $3,320 $8,000 - $3,320
-
MMBtu
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,270 $3,500 $3,270
-
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $700 $500 $700
14,947
kWh
-
08 2.2532: Use only amount of air necessary to prevent explosion hazard $532 $400 $446
9,672
kWh
$86
-
MMBtu
09 2.7314: Reduce ventilation air $380 $900 $75
1,758
kWh
$305
-
MMBtu
TOTAL RECOMMENDED $28,217 $36,074 $8,556
113,715
kWh
$19,661
-
MMBtu
TOTAL IMPLEMENTED $8,502 $9,100 $1,146
24,619
kWh
$7,356
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs