ITAC Assessment: CO0168
ITAC logo
ITAC Assessment: CO0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product VARIOUS METAL PRODUCTS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 2,500,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,841 1,873,095
kWh
Natural Gas $19,258 4,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $1,360 $250 $970
-
kWh
$390
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,015 $4,600 $3,085
61,547
kWh
$(-1,070.0)
-
MMBtu
03 2.2514: Cover open tanks $1,600 $400 $1,600
31,946
kWh
-
04 2.2511: Insulate bare equipment $590 $420 $590
11,723
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $955 $425 $955
19,050
kWh
-
06 2.6232: Install set-back timers $604 $1,600 $604
12,016
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $550 $300 $550
10,844
kWh
-
08 2.2437: Recover waste heat from equipment $903 $840 - $903
-
MMBtu
09 2.1123: Install automatic stack damper $410 $1,000 - $410
-
MMBtu
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $210 $210 $210
4,103
kWh
-
TOTAL RECOMMENDED $9,197 $10,045 $8,564
151,229
kWh
$633
-
MMBtu
TOTAL IMPLEMENTED $5,465 $2,795 $4,665
73,563
kWh
$800
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs