ITAC Assessment: TA0088
ITAC logo
ITAC Assessment: TA0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Sodium Sulfate
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 173,000
ft2
Annual Production 288,000,000
lb
Production Hrs. Annual 8,510
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $936,124 31,922,217
kWh
Electricity Demand $446,881 52,380
kW-mo/yr
Electricity Fees $935 -
Natural Gas $636,164 117,823
MMBtu
Other Energy $1,121,940 785,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $358,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $250,915

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Other Liquid (haz) Savings
01 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $146,590 $20,000 $33,520
1,122,575
kWh
$13,070
-
kW-mo/yr
- $100,000
-
MMBtu
-
02 2.2515: Use optimum thickness insulation $86,400 $1,610 $86,400
2,893,422
kWh
- - - -
03 2.2511: Insulate bare equipment $66,520 $1,010 - - $66,520
-
MMBtu
- -
04 2.2511: Insulate bare equipment $20,580 $15,340 $20,580
689,140
kWh
- - - -
05 2.7245: Use direct air supply to exhaust hoods $15,810 $2,000 $11,280
377,733
kWh
$4,530
-
kW-mo/yr
- - -
06 3.7214: Reduce or eliminate waste $18,000 $1,000 - - - - $18,000
-
gal
07 2.2136: Install / repair insulation on steam lines $3,995 $1,000 - - $3,995
-
MMBtu
- -
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,000 - $1,000
33,483
kWh
- - - -
TOTAL RECOMMENDED $358,895 $41,960 $152,780
5,116,353
kWh
$17,600
-
kW-mo/yr
$70,515
-
MMBtu
$100,000
-
MMBtu
$18,000
-
gal
TOTAL IMPLEMENTED $250,915 $25,010 $44,800
1,500,308
kWh
$17,600
-
kW-mo/yr
$70,515
-
MMBtu
$100,000
-
MMBtu
$18,000
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs