Assessment Year | 1989 |
---|---|
Principal Product | PRESSURE SENSITIVE TAPE |
NAICS |
n/a
|
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 120,000
thousand feet
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $640,692 | 23,924,971 |
kWh
|
$0.027 |
Natural Gas | $335,968 | 110,342 |
MMBtu
|
$3.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,780 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,474 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,440 | - | - |
$4,440
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $4,885 | $15,000 | - |
$4,885
-
MMBtu
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,650 | $2,560 |
$4,650
101,407
kWh
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $610 | $5,000 | - |
$610
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $306 | $500 |
$306
6,741
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,680 | $3,900 |
$2,680
58,324
kWh
|
- | |
07 | 2.7261: Install timers and/or thermostats | $1,300 | $5,000 | - |
$1,300
-
MMBtu
|
|
08 | 2.6232: Install set-back timers | $244 | $400 |
$94
3,517
kWh
|
$150
-
MMBtu
|
|
09 | 2.8114: Change rate schedules or other changes in utility service | $26,900 | $250 |
$26,900
-
kWh
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,765 | $414 |
$2,765
60,082
kWh
|
- | |
TOTAL RECOMMENDED | $48,780 | $33,024 |
$37,395
230,071
kWh
|
$11,385
-
MMBtu
|
||
TOTAL IMPLEMENTED | $48,474 | $32,524 |
$37,089
223,330
kWh
|
$11,385
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs