Assessment Year | 1989 |
---|---|
Principal Product | PRINTED PAPER |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 3,600,000
lb
|
Production Hrs. Annual | 5,015
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,425 | 1,060,961 |
kWh
|
$0.068 |
Natural Gas | $29,401 | 7,334 |
MMBtu
|
$4.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,528 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,538 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1123: Install automatic stack damper | $2,510 | $900 | - |
$2,510
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,830 | $3,670 |
$2,830
41,325
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,283 | $1,360 |
$1,283
18,757
kWh
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $875 | $1,859 | - |
$875
-
MMBtu
|
|
05 | 2.7261: Install timers and/or thermostats | $860 | $1,160 | - |
$860
-
MMBtu
|
|
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $690 | $100 |
$690
-
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $480 | $300 |
$480
7,034
kWh
|
- | |
TOTAL RECOMMENDED | $9,528 | $9,349 |
$5,283
67,116
kWh
|
$4,245
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,538 | $8,149 |
$4,803
60,082
kWh
|
$1,735
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs