ITAC Assessment: CO0146
ITAC logo
ITAC Assessment: CO0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PRINTED PAPER
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 3,600,000
lb
Production Hrs. Annual 5,015
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,425 1,060,961
kWh
Natural Gas $29,401 7,334
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,538

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1123: Install automatic stack damper $2,510 $900 - $2,510
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,830 $3,670 $2,830
41,325
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,283 $1,360 $1,283
18,757
kWh
-
04 2.2136: Install / repair insulation on steam lines $875 $1,859 - $875
-
MMBtu
05 2.7261: Install timers and/or thermostats $860 $1,160 - $860
-
MMBtu
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $690 $100 $690
-
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $480 $300 $480
7,034
kWh
-
TOTAL RECOMMENDED $9,528 $9,349 $5,283
67,116
kWh
$4,245
-
MMBtu
TOTAL IMPLEMENTED $6,538 $8,149 $4,803
60,082
kWh
$1,735
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs