Assessment Year 1988
Principal Product COMMERCIAL PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 6,400
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,008 2,038,101
kWh
Natural Gas $50,699 12,578
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $470 $200 $470
7,913
kWh
- -
02 2.2437: Recover waste heat from equipment $536 $2,000 - $536
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $996 $510 $343
13,189
kWh
$653
-
MMBtu
-
04 2.6218: Turn off equipment when not in use $127 - - $127
-
MMBtu
-
05 2.6214: Shut off pilots in standby equipment $130 - - $250
-
MMBtu
$(-120.0)
06 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,047 $48 $166
2,931
kWh
$881
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,693 $200 $1,693
28,722
kWh
- -
08 2.8121: Apply for tax-free status for energy purchases $1,178 $250 $721
-
kWh
$457
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $348 $375 $348
5,862
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $3,884 $1,472 $3,884
65,944
kWh
- -
TOTAL RECOMMENDED $10,409 $5,055 $7,625
124,561
kWh
$2,904
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $6,836 $1,970 $5,241
76,788
kWh
$1,715
-
MMBtu
$(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs