| Assessment Year | 2023 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $500 k to 1M |
| # of Employees | 2 |
| Plant Area |
24,488
ft2
|
| Annual Production | 210,240
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $63,096 | 1,232,240 |
kWh
|
$0.051 | |
| Electricity Demand | $36,312 | 2,598 |
kW-mo/yr
|
$13.98 | |
| Electricity Fees | $999 | - |
|
- | |
| Natural Gas | $5,078 | 604 |
MMBtu
|
$8.40 | |
| Waste Disposal Costs | |||||
| Water Usage | $1 | 1 |
Tgal
|
$1.00 | |
| TOTAL YEARLY COSTS | $105,486 | ||||
| RECOMMENDED SAVINGS* | $70,463 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $58,625 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.4155: Meter waste water | $31,255 | $151,280 |
$1,255
24,515
kWh
|
- | - | $30,000 | |
| 02 | 2.4323: Use optimum size and capacity equipment | $18,134 | $8,660 |
$11,376
222,189
kWh
|
$6,758
-
kW-mo/yr
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $11,038 | $4,600 |
$1,066
20,652
kWh
|
$(-28.0)
-
kW-mo/yr
|
- | $10,000 | |
| 04 | 2.4133: Use most efficient type of electric motors | $8,182 | $4,945 |
$8,182
160,151
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $854 | $2,700 |
$588
11,484
kWh
|
$266
-
kW-mo/yr
|
- | - | |
| 06 | 3.4131: Minimize contamination of water before treatment | $800 | $1,548 | - | - | $800 | - | |
| 07 | 3.7391: Implement a maintenance program to keep racks and tanks free of rust, cracks, or corrosion | $200 | $2,040 | - | - | $(-480.0) | $680 | |
| TOTAL RECOMMENDED | $70,463 | $175,773 |
$22,467
438,991
kWh
|
$6,996
-
kW-mo/yr
|
$320 | $40,680 | ||
| TOTAL IMPLEMENTED | $58,625 | $169,625 |
$21,401
418,339
kWh
|
$7,024
-
kW-mo/yr
|
$(-480.0) | $30,680 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs