ITAC Assessment: CO0135
ITAC logo
ITAC Assessment: CO0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product RIFLE SCOPES & MOUNTINGS
NAICS
n/a
SIC 3489: Ordnance and Accessories, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 6,292
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,718 1,766,999
kWh
Natural Gas $35,427 8,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,334

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $1,130 $350 $1,230
20,223
kWh
- $(-100.0)
02 2.2514: Cover open tanks $1,554 $840 - $1,554
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $976 $1,000 $976
16,120
kWh
- -
04 2.2437: Recover waste heat from equipment $638 $500 - $638
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $805 $200 $805
13,189
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,230 $400 $1,230
20,223
kWh
- -
07 2.7441: Replace broken windows and/or window sash $250 $130 - $250
-
MMBtu
-
08 2.1123: Install automatic stack damper $653 $1,120 - $653
-
MMBtu
-
09 2.7122: Disconnect ballasts $540 $250 $540
8,792
kWh
- -
TOTAL RECOMMENDED $7,776 $4,790 $4,781
78,547
kWh
$3,095
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $5,334 $3,320 $4,781
78,547
kWh
$653
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs