Assessment Year | 1988 |
---|---|
Principal Product | RIFLE SCOPES & MOUNTINGS |
NAICS |
n/a
|
SIC | 3489: Ordnance and Accessories, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 6,292
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,718 | 1,766,999 |
kWh
|
$0.061 |
Natural Gas | $35,427 | 8,892 |
MMBtu
|
$3.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,776 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,334 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6242: Minimize operation of equipment maintained in standby condition | $1,130 | $350 |
$1,230
20,223
kWh
|
- | $(-100.0) | |
02 | 2.2514: Cover open tanks | $1,554 | $840 | - |
$1,554
-
MMBtu
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $976 | $1,000 |
$976
16,120
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $638 | $500 | - |
$638
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $805 | $200 |
$805
13,189
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,230 | $400 |
$1,230
20,223
kWh
|
- | - | |
07 | 2.7441: Replace broken windows and/or window sash | $250 | $130 | - |
$250
-
MMBtu
|
- | |
08 | 2.1123: Install automatic stack damper | $653 | $1,120 | - |
$653
-
MMBtu
|
- | |
09 | 2.7122: Disconnect ballasts | $540 | $250 |
$540
8,792
kWh
|
- | - | |
TOTAL RECOMMENDED | $7,776 | $4,790 |
$4,781
78,547
kWh
|
$3,095
-
MMBtu
|
$(-100.0) | ||
TOTAL IMPLEMENTED | $5,334 | $3,320 |
$4,781
78,547
kWh
|
$653
-
MMBtu
|
$(-100.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs