ITAC Assessment: SF0028
ITAC logo
ITAC Assessment: SF0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Frozen Desserts
NAICS
n/a
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 34,000
ft2
Annual Production 750,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,364 679,660
kWh
Natural Gas $15,418 2,698
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $470 $330 $470
4,689
kWh
-
02 2.4133: Use most efficient type of electric motors $383 $191 $383
3,810
kWh
-
03 2.2437: Recover waste heat from equipment $1,630 $2,400 - $1,630
-
MMBtu
04 2.3132: Recharge batteries on during off-peak demand periods $2,116 - $2,116
-
kWh
-
05 2.7135: Install occupancy sensors $421 $535 $421
4,103
kWh
-
06 2.2437: Recover waste heat from equipment $1,959 $5,325 - $1,959
-
MMBtu
TOTAL RECOMMENDED $6,979 $8,781 $3,390
12,602
kWh
$3,589
-
MMBtu
TOTAL IMPLEMENTED $3,390 $1,056 $3,390
12,602
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs