Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product RECREATIONAL KNIVES
NAICS
n/a
SIC 3421: Cutlery
Sales Range $1
M
to 5
M
# of Employees 82
Plant Area
n/a
Annual Production 354,000
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,676 1,505,862
kWh
Natural Gas $16,230 4,001
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,799

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $711 $500 $711
12,309
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $683 $375 $683
11,723
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $889 - $889
15,533
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $4,270 $10,400 $(-212.0)
(-3,810)
kWh
$4,482
-
MMBtu
05 2.7261: Install timers and/or thermostats $2,794 $4,000 - $2,794
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $162 $349 $162
2,931
kWh
-
07 2.3191: Use demand controller or load shedder $4,867 $3,600 $4,867
-
kWh
-
08 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $5,514 $1,000 - $5,514
-
MMBtu
09 2.1123: Install automatic stack damper $677 $900 - $677
-
MMBtu
10 2.8121: Apply for tax-free status for energy purchases $487 $250 - $487
-
MMBtu
TOTAL RECOMMENDED $21,054 $21,374 $7,100
38,686
kWh
$13,954
-
MMBtu
TOTAL IMPLEMENTED $7,799 $5,074 $7,312
42,496
kWh
$487
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs