ITAC Assessment: CO0107
ITAC logo
ITAC Assessment: CO0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PRINTED CIRCUIT BOARDS
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area
n/a
Annual Production 527,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,408 898,886
kWh
Natural Gas $5,023 1,206
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $161 $200 $161
2,345
kWh
-
02 2.2437: Recover waste heat from equipment $226 $2,000 - $226
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,136 $700 $1,136
17,292
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $8,463 $1,200 $8,463
128,077
kWh
-
05 2.7261: Install timers and/or thermostats $1,111 $1,150 - $1,111
-
MMBtu
06 2.8114: Change rate schedules or other changes in utility service $3,215 $250 $2,983
-
kWh
$232
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $921 $318 $921
14,068
kWh
-
TOTAL RECOMMENDED $15,233 $5,818 $13,664
161,782
kWh
$1,569
-
MMBtu
TOTAL IMPLEMENTED $6,770 $4,618 $5,201
33,705
kWh
$1,569
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs