ITAC Assessment: CO0103
ITAC logo
ITAC Assessment: CO0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CONCRETE BLOCK & BRICK
NAICS
n/a
SIC 3271: Concrete Block and Brick
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,072 388,042
kWh
Natural Gas $25,032 6,409
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $324 $50 $324
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,154 - $4,154
-
kWh
-
03 2.2511: Insulate bare equipment $616 $1,100 - $616
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,705 $6,000 - $3,705
-
MMBtu
05 2.7261: Install timers and/or thermostats $1,774 $2,100 - $1,774
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,976 $5,729 $2,976
21,395
kWh
-
TOTAL RECOMMENDED $13,549 $14,979 $7,454
21,395
kWh
$6,095
-
MMBtu
TOTAL IMPLEMENTED $4,478 $50 $4,478
-
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs