| Assessment Year | 1987 |
|---|---|
| Principal Product | MEDICAL EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 4,400
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $39,657 | 757,034 |
kWh
|
$0.052 |
| Natural Gas | $28,490 | 6,987 |
MMBtu
|
$4.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,958 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,958 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $825 | $200 |
$825
15,826
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $72 | $50 |
$72
1,465
kWh
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $8,334 | $3,600 | - |
$8,334
-
MMBtu
|
|
| 04 | 2.3212: Optimize plant power factor | $3,060 | $3,010 |
$3,060
-
kWh
|
- | |
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $139 | $450 | - |
$139
-
MMBtu
|
|
| 06 | 2.8114: Change rate schedules or other changes in utility service | $1,703 | $250 |
$1,703
-
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $825 | $558 |
$825
15,826
kWh
|
- | |
| TOTAL RECOMMENDED | $14,958 | $8,118 |
$6,485
33,117
kWh
|
$8,473
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,958 | $8,118 |
$6,485
33,117
kWh
|
$8,473
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs