ITAC Assessment: CO0102
ITAC logo
ITAC Assessment: CO0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MEDICAL EQUIPMENT
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 4,400
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,657 757,034
kWh
Natural Gas $28,490 6,987
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $825 $200 $825
15,826
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $72 $50 $72
1,465
kWh
-
03 2.7261: Install timers and/or thermostats $8,334 $3,600 - $8,334
-
MMBtu
04 2.3212: Optimize plant power factor $3,060 $3,010 $3,060
-
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $139 $450 - $139
-
MMBtu
06 2.8114: Change rate schedules or other changes in utility service $1,703 $250 $1,703
-
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $825 $558 $825
15,826
kWh
-
TOTAL RECOMMENDED $14,958 $8,118 $6,485
33,117
kWh
$8,473
-
MMBtu
TOTAL IMPLEMENTED $14,958 $8,118 $6,485
33,117
kWh
$8,473
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs