ITAC Assessment: CO0101
ITAC logo
ITAC Assessment: CO0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MATTRESS INNERSPRING
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area
n/a
Annual Production 400,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,000 1,383,060
kWh
Natural Gas $35,057 8,307
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $1,874 $3,850 - $1,874
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $212 $200 $212
4,689
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,939 $900 $1,939
43,962
kWh
- -
04 2.4312: Improve lubrication practices $615 - $615
14,068
kWh
- -
05 2.3212: Optimize plant power factor $2,736 $3,600 $2,736
-
kWh
- -
06 2.7261: Install timers and/or thermostats $2,805 $2,100 - $2,805
-
MMBtu
-
07 2.2443: Re-use or recycle hot or cold process exhaust air $6,083 $16,500 $(-1,099.0)
(-24,912)
kWh
$7,182
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $331 $1,846 $331
7,620
kWh
- -
09 3.6192: Use a less expensive method of waste removal $9,000 - - - $9,000
TOTAL RECOMMENDED $25,595 $28,996 $4,734
45,427
kWh
$11,861
-
MMBtu
$9,000
TOTAL IMPLEMENTED $7,707 $10,396 $5,833
70,339
kWh
$1,874
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs