Assessment Year | 1987 |
---|---|
Principal Product | MATTRESS INNERSPRING |
NAICS |
n/a
|
SIC | 2515: Mattresses, Foundations, and Convertible Beds |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
n/a
|
Annual Production | 400,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $61,000 | 1,383,060 |
kWh
|
$0.044 |
Natural Gas | $35,057 | 8,307 |
MMBtu
|
$4.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,595 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,707 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $1,874 | $3,850 | - |
$1,874
-
MMBtu
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $212 | $200 |
$212
4,689
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,939 | $900 |
$1,939
43,962
kWh
|
- | - | |
04 | 2.4312: Improve lubrication practices | $615 | - |
$615
14,068
kWh
|
- | - | |
05 | 2.3212: Optimize plant power factor | $2,736 | $3,600 |
$2,736
-
kWh
|
- | - | |
06 | 2.7261: Install timers and/or thermostats | $2,805 | $2,100 | - |
$2,805
-
MMBtu
|
- | |
07 | 2.2443: Re-use or recycle hot or cold process exhaust air | $6,083 | $16,500 |
$(-1,099.0)
(-24,912)
kWh
|
$7,182
-
MMBtu
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $331 | $1,846 |
$331
7,620
kWh
|
- | - | |
09 | 3.6192: Use a less expensive method of waste removal | $9,000 | - | - | - | $9,000 | |
TOTAL RECOMMENDED | $25,595 | $28,996 |
$4,734
45,427
kWh
|
$11,861
-
MMBtu
|
$9,000 | ||
TOTAL IMPLEMENTED | $7,707 | $10,396 |
$5,833
70,339
kWh
|
$1,874
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs