Assessment Year | 1987 |
---|---|
Principal Product | INJECTION MOLDED PLASTIC |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 4,540
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,754 | 1,774,033 |
kWh
|
$0.058 |
Natural Gas | $15,814 | 3,630 |
MMBtu
|
$4.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,008 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,206 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $156 | $100 |
$156
2,638
kWh
|
- | |
02 | 2.4312: Improve lubrication practices | $1,025 | - |
$1,025
17,585
kWh
|
- | |
03 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $2,950 | $65 |
$961
16,706
kWh
|
$1,989
-
MMBtu
|
|
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,403 | $1,600 | - |
$2,403
-
MMBtu
|
|
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,374 | $3,500 |
$1,712
18,171
kWh
|
$(-338.0)
-
MMBtu
|
|
06 | 2.7261: Install timers and/or thermostats | $3,327 | $3,200 | - |
$3,327
-
MMBtu
|
|
07 | 2.7492: Use proper thickness of insulation on building envelope | $290 | $690 | - |
$290
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,483 | $577 |
$1,483
25,498
kWh
|
- | |
TOTAL RECOMMENDED | $13,008 | $9,732 |
$5,337
80,598
kWh
|
$7,671
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,206 | $4,632 |
$2,600
44,842
kWh
|
$5,606
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs