Assessment Year | 1987 |
---|---|
Principal Product | PRECAST CONCRETE |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 90 |
Plant Area |
n/a
|
Annual Production | 621
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,311 | 796,600 |
kWh
|
$0.072 |
Natural Gas | $42,900 | 10,732 |
MMBtu
|
$4.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,064 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,764 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,275 | $300 |
$1,275
17,878
kWh
|
- | |
02 | 2.4312: Improve lubrication practices | $790 | - |
$790
11,137
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $1,125 | $2,000 | - |
$1,125
-
MMBtu
|
|
04 | 2.7261: Install timers and/or thermostats | $2,306 | $1,800 | - |
$2,306
-
MMBtu
|
|
05 | 2.7492: Use proper thickness of insulation on building envelope | $340 | $1,485 | - |
$340
-
MMBtu
|
|
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,893 | $600 | - |
$1,893
-
MMBtu
|
|
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,311 | $500 |
$1,311
-
kWh
|
- | |
08 | 2.7261: Install timers and/or thermostats | $6,726 | $6,300 | - |
$6,726
-
MMBtu
|
|
09 | 2.8121: Apply for tax-free status for energy purchases | $3,478 | $250 |
$1,988
-
kWh
|
$1,490
-
MMBtu
|
|
10 | 2.7111: Reduce illumination to minimum necessary levels | $3,820 | - |
$3,820
53,048
kWh
|
- | |
TOTAL RECOMMENDED | $23,064 | $13,235 |
$9,184
82,063
kWh
|
$13,880
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,764 | $10,335 |
$7,083
70,926
kWh
|
$9,681
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs