ITAC Assessment: CO0096
ITAC logo
ITAC Assessment: CO0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PRECAST CONCRETE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area
n/a
Annual Production 621
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,311 796,600
kWh
Natural Gas $42,900 10,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,064 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,764

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,275 $300 $1,275
17,878
kWh
-
02 2.4312: Improve lubrication practices $790 - $790
11,137
kWh
-
03 2.2437: Recover waste heat from equipment $1,125 $2,000 - $1,125
-
MMBtu
04 2.7261: Install timers and/or thermostats $2,306 $1,800 - $2,306
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $340 $1,485 - $340
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,893 $600 - $1,893
-
MMBtu
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,311 $500 $1,311
-
kWh
-
08 2.7261: Install timers and/or thermostats $6,726 $6,300 - $6,726
-
MMBtu
09 2.8121: Apply for tax-free status for energy purchases $3,478 $250 $1,988
-
kWh
$1,490
-
MMBtu
10 2.7111: Reduce illumination to minimum necessary levels $3,820 - $3,820
53,048
kWh
-
TOTAL RECOMMENDED $23,064 $13,235 $9,184
82,063
kWh
$13,880
-
MMBtu
TOTAL IMPLEMENTED $16,764 $10,335 $7,083
70,926
kWh
$9,681
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs