Assessment Year | 1995 |
---|---|
Principal Product | Fabricated Metal Product |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 320 |
Plant Area |
260,000
ft2
|
Annual Production | 5,500
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $610,225 | 7,131,594 |
kWh
|
$0.086 |
Natural Gas | $49,431 | 8,781 |
MMBtu
|
$5.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,338 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,756 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $3,420 | $7,500 |
$3,420
69,754
kWh
|
- | - | |
02 | 2.2421: Install waste heat boiler to provide direct power | $3,648 | $977 | - |
$3,648
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $656 | $702 | - |
$656
-
MMBtu
|
- | |
04 | 2.1241: Reduce excessive boiler blowdown | $664 | $15 | - |
$664
-
MMBtu
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $4,118 | $1,583 |
$4,118
45,721
kWh
|
- | - | |
06 | 2.7131: Add area lighting switches | $1,489 | $800 |
$1,489
19,050
kWh
|
- | - | |
07 | 2.7132: Install timers on light switches in little used areas | $1,093 | $90 |
$1,093
14,947
kWh
|
- | - | |
08 | 2.7134: Use photocell controls | $337 | $135 |
$337
2,931
kWh
|
- | - | |
09 | 3.5316: Contract a wood pallet recycling company | $6,480 | - | - | - |
$6,480
-
lb
|
|
10 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,433 | - | - | - |
$1,433
-
lb
|
|
TOTAL RECOMMENDED | $23,338 | $11,802 |
$10,457
152,403
kWh
|
$4,968
-
MMBtu
|
$7,913
-
lb
|
||
TOTAL IMPLEMENTED | $20,756 | $10,912 |
$7,875
118,406
kWh
|
$4,968
-
MMBtu
|
$7,913
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs