ITAC Assessment: CO0093
ITAC logo
ITAC Assessment: CO0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CORRUGATED PAPER PRODCTS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 472,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,408 2,915,885
kWh
Natural Gas $214,416 53,192
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $1,434 $1,200 $1,434
-
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $480 $125 - $480
-
MMBtu
03 2.7492: Use proper thickness of insulation on building envelope $406 $1,000 - $406
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $1,279 $2,690 - $1,279
-
MMBtu
05 2.2122: Install / repair insulation on condensate lines $109 $70 - $109
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $6,787 $300 - $6,787
-
MMBtu
07 2.1213: Direct warmest air to combustion intake $1,065 $400 - $1,065
-
MMBtu
08 2.2135: Repair and eliminate steam leaks $2,521 $300 - $2,521
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,732 $150 $1,732
30,188
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $609 $180 $609
10,551
kWh
-
11 2.4133: Use most efficient type of electric motors $374 $1,167 $374
6,448
kWh
-
12 2.7221: Lower temperature during the winter season and vice-versa $14,707 $1,100 $123
2,052
kWh
$14,584
-
MMBtu
13 2.7142: Utilize higher efficiency lamps and/or ballasts $1,292 $409 $1,292
22,567
kWh
-
TOTAL RECOMMENDED $32,795 $9,091 $5,564
71,806
kWh
$27,231
-
MMBtu
TOTAL IMPLEMENTED $17,682 $6,991 $5,441
69,754
kWh
$12,241
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs