ITAC Assessment: CO0083
ITAC logo
ITAC Assessment: CO0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product FIBERGLASS ROOFING MATERIAL
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,924 1,608,148
kWh
Natural Gas $119,687 30,535
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,881 $300 - $6,881
-
MMBtu
02 2.1222: Install turbulators $4,207 $1,200 - $4,207
-
MMBtu
03 2.2444: Use hot process fluids to preheat incoming process fluids $2,330 $5,000 - $2,330
-
MMBtu
04 2.2511: Insulate bare equipment $1,718 $1,000 - $1,718
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $2,812 $500 - $2,812
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $302 $500 $302
6,448
kWh
-
07 2.4312: Improve lubrication practices $150 - $150
3,224
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $333 $900 $333
7,034
kWh
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $397 $20 $397
8,499
kWh
-
10 2.4322: Use or replace with energy efficient substitutes $9,596 $20,000 $9,596
186,108
kWh
-
11 2.6232: Install set-back timers $552 $395 $552
10,551
kWh
-
TOTAL RECOMMENDED $29,278 $29,815 $11,330
221,864
kWh
$17,948
-
MMBtu
TOTAL IMPLEMENTED $16,805 $4,795 $1,187
24,033
kWh
$15,618
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs