ITAC Assessment: HO0029
ITAC logo
ITAC Assessment: HO0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SM. METAL STAMPINGS
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 50,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,788 461,899
kWh
Natural Gas $20,440 3,037
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $322

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,907 $2,910 $4,133
30,481
kWh
- $(-226.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,989 $1,400 $1,989
14,654
kWh
- -
03 2.4133: Use most efficient type of electric motors $322 $392 $322
2,345
kWh
- -
04 2.2136: Install / repair insulation on steam lines $305 $325 - $305
-
MMBtu
-
TOTAL RECOMMENDED $6,523 $5,027 $6,444
47,480
kWh
$305
-
MMBtu
$(-226.0)
TOTAL IMPLEMENTED $322 $392 $322
2,345
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs