Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Clay Tiles
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 65,750
ft2
Annual Production 11,500,000
pieces
Production Hrs. Annual 6,528
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,465 789,333
kWh
Electricity Demand $8,193 2,077
kW-mo/yr
Natural Gas $208,785 27,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $850 $282 $806
6,340
kWh
$44
-
kW-mo/yr
- - -
02 2.8114: Change rate schedules or other changes in utility service $8,781 $4,375 - - $8,781 - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,936 $3,085 $4,672
36,663
kWh
$264
-
kW-mo/yr
- - -
04 2.7134: Use photocell controls $2,262 $2,760 $1,951
15,339
kWh
$311
-
kW-mo/yr
- - -
05 2.7134: Use photocell controls $2,058 $2,880 $1,746
13,728
kWh
$312
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,715 $2,638 $1,620
12,733
kWh
$95
-
kW-mo/yr
- - -
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $753 $1,520 - - - $753
-
MMBtu
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,293 $5,681 $2,293
18,032
kWh
- - - -
09 2.7134: Use photocell controls $1,017 $3,059 $900
7,077
kWh
$117
-
kW-mo/yr
- - -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $14,141 $36,000 - - - - $14,141
-
lb
TOTAL RECOMMENDED $38,806 $62,280 $13,988
109,912
kWh
$1,143
-
kW-mo/yr
$8,781 $753
-
MMBtu
$14,141
-
lb
TOTAL IMPLEMENTED $13,116 $11,874 $3,326
26,150
kWh
$256
-
kW-mo/yr
$8,781 $753
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs