Assessment Year | 1986 |
---|---|
Principal Product | PORTLAND CEMENT |
NAICS |
n/a
|
SIC | 3241: Cement, Hydraulic |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 500,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,928,654 | 68,867,234 |
kWh
|
$0.043 |
Natural Gas | $1,433,667 | 344,696 |
MMBtu
|
$4.16 |
Coal | $2,336,000 | 2,029,400 |
MMBtu
|
$1.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,378,290 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $127,486 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
---|---|---|---|---|---|---|---|
01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $1,207,312 | $5,000,000 |
$1,315,044
43,800,118
kWh
|
- |
$(-107,732.0)
-
MMBtu
|
|
02 | 2.4312: Improve lubrication practices | $56,931 | - |
$56,931
1,339,097
kWh
|
- | - | |
03 | 2.2511: Insulate bare equipment | $43,492 | $37,500 | - | - |
$43,492
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $26,207 | $7,000 |
$26,207
616,354
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $13,012 | $12,000 |
$13,012
305,979
kWh
|
- | - | |
06 | 2.7261: Install timers and/or thermostats | $3,423 | $46 |
$754
17,878
kWh
|
$2,669
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,097 | $3,098 |
$25,097
590,270
kWh
|
- | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,816 | $1,000 | - |
$2,816
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $1,378,290 | $5,060,644 |
$1,437,045
46,669,696
kWh
|
$5,485
-
MMBtu
|
$(-64,240.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $127,486 | $23,144 |
$122,001
2,869,578
kWh
|
$5,485
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs