ITAC Assessment: CO0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PORTLAND CEMENT
NAICS
n/a
SIC 3241: Cement, Hydraulic
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 500,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,928,654 68,867,234
kWh
Natural Gas $1,433,667 344,696
MMBtu
Coal $2,336,000 2,029,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,378,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $127,486

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $1,207,312 $5,000,000 $1,315,044
43,800,118
kWh
- $(-107,732.0)
-
MMBtu
02 2.4312: Improve lubrication practices $56,931 - $56,931
1,339,097
kWh
- -
03 2.2511: Insulate bare equipment $43,492 $37,500 - - $43,492
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $26,207 $7,000 $26,207
616,354
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,012 $12,000 $13,012
305,979
kWh
- -
06 2.7261: Install timers and/or thermostats $3,423 $46 $754
17,878
kWh
$2,669
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $25,097 $3,098 $25,097
590,270
kWh
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $2,816 $1,000 - $2,816
-
MMBtu
-
TOTAL RECOMMENDED $1,378,290 $5,060,644 $1,437,045
46,669,696
kWh
$5,485
-
MMBtu
$(-64,240.0)
-
MMBtu
TOTAL IMPLEMENTED $127,486 $23,144 $122,001
2,869,578
kWh
$5,485
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs