Assessment Year | 2010 |
---|---|
Principal Product | Aircraft Seats |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 2531: Public Building and Related Furniture |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
107,000
ft2
|
Annual Production | 4,500
pieces
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $273,509 | 3,424,800 |
kWh
|
$0.080 |
Electricity Demand | $72,100 | 10,300 |
kW-mo/yr
|
$7.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $118,617 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,476 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $39,683 | $55,919 |
$31,080
310,799
kWh
|
$8,603
-
kW-mo/yr
|
|
02 | 2.7425: Clean or color roof to reduce solar load | $37,497 | $39,695 |
$29,368
293,677
kWh
|
$8,129
-
kW-mo/yr
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $17,892 | $2,000 |
$14,013
140,126
kWh
|
$3,879
-
kW-mo/yr
|
|
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,048 | $13,338 |
$6,303
63,032
kWh
|
$1,745
-
kW-mo/yr
|
|
05 | 2.7135: Install occupancy sensors | $5,576 | $14,400 |
$4,367
43,666
kWh
|
$1,209
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,870 | $1,210 |
$4,278
42,785
kWh
|
$592
-
kW-mo/yr
|
|
07 | 2.4323: Use optimum size and capacity equipment | $3,644 | $11,985 |
$2,854
28,535
kWh
|
$790
-
kW-mo/yr
|
|
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,407 | $40 |
$953
9,532
kWh
|
$454
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $118,617 | $138,587 |
$93,216
932,152
kWh
|
$25,401
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $77,476 | $86,907 |
$60,994
609,940
kWh
|
$16,482
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs