ITAC Assessment: MI0198
ITAC logo
ITAC Assessment: MI0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Aircraft Seats
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 2531: Public Building and Related Furniture
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 107,000
ft2
Annual Production 4,500
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,509 3,424,800
kWh
Electricity Demand $72,100 10,300
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $39,683 $55,919 $31,080
310,799
kWh
$8,603
-
kW-mo/yr
02 2.7425: Clean or color roof to reduce solar load $37,497 $39,695 $29,368
293,677
kWh
$8,129
-
kW-mo/yr
03 2.7221: Lower temperature during the winter season and vice-versa $17,892 $2,000 $14,013
140,126
kWh
$3,879
-
kW-mo/yr
04 2.7447: Install vinyl strip / high speed / air curtain doors $8,048 $13,338 $6,303
63,032
kWh
$1,745
-
kW-mo/yr
05 2.7135: Install occupancy sensors $5,576 $14,400 $4,367
43,666
kWh
$1,209
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,870 $1,210 $4,278
42,785
kWh
$592
-
kW-mo/yr
07 2.4323: Use optimum size and capacity equipment $3,644 $11,985 $2,854
28,535
kWh
$790
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,407 $40 $953
9,532
kWh
$454
-
kW-mo/yr
TOTAL RECOMMENDED $118,617 $138,587 $93,216
932,152
kWh
$25,401
-
kW-mo/yr
TOTAL IMPLEMENTED $77,476 $86,907 $60,994
609,940
kWh
$16,482
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs