ITAC Assessment: CO0074
ITAC logo
ITAC Assessment: CO0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product VARIOS LENGTH/WIDTH BOARD
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 27,300
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,888 2,805,100
kWh
Natural Gas $10,504 4,734
MMBtu
Wood $101,700 101,704
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,415

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $11,487 $120,000 $16,220
291,325
kWh
- $(-4,733.0)
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,038 $4,650 $10,038
143,025
kWh
- -
03 2.4312: Improve lubrication practices $16,456 - $16,456
234,467
kWh
- -
04 2.2511: Insulate bare equipment $1,724 $2,000 $1,584
22,567
kWh
$140
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $31,018 - $31,018
-
kWh
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $1,296 $400 $1,296
18,464
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $1,810 - $1,810
25,791
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,571 $500 $2,571
36,635
kWh
- -
10 2.7261: Install timers and/or thermostats $638 $200 $638
9,086
kWh
- -
11 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,405 $1,000 $1,625
23,154
kWh
$(-220.0)
-
MMBtu
-
12 2.7142: Utilize higher efficiency lamps and/or ballasts $226 $132 $226
3,224
kWh
- -
TOTAL RECOMMENDED $78,669 $128,882 $83,482
807,738
kWh
$(-80.0)
-
MMBtu
$(-4,733.0)
-
MMBtu
TOTAL IMPLEMENTED $63,415 $5,682 $63,415
461,606
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs