ITAC Assessment: KU0492
ITAC logo
ITAC Assessment: KU0492
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product remanufactured railroad parts
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 57,000
ft2
Annual Production 54,200
pieces
Production Hrs. Annual 4,280
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,482 1,633,353
kWh
Electricity Demand $24,400 4,636
kW-mo/yr
Natural Gas $24,281 3,851
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,470 $7,450 $2,050
36,635
kWh
$620
-
kW-mo/yr
- $800 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,750 $700 $2,180
38,980
kWh
$570
-
kW-mo/yr
- - - -
03 2.7231: Use radiant heater for spot heating $1,530 $2,820 - - $1,530
-
MMBtu
- - -
04 2.7132: Install timers on light switches in little used areas $750 $500 $750
13,482
kWh
- - - - -
05 2.4133: Use most efficient type of electric motors $400 $1,000 $320
5,862
kWh
$80
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $380 $420 $130
2,345
kWh
$20
-
kW-mo/yr
- $230 - -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $1,860 $1,450 - - - - - $1,860
08 3.8314: Purchase high materials in returnable bulk containers $1,510 $940 - - - - - $1,510
09 4.231: Purchase equipment instead of leasing $4,200 $12,000 - - - - $4,200 -
TOTAL RECOMMENDED $16,850 $27,280 $5,430
97,304
kWh
$1,290
-
kW-mo/yr
$1,530
-
MMBtu
$1,030 $4,200 $3,370
TOTAL IMPLEMENTED $8,860 $14,640 $2,500
44,842
kWh
$650
-
kW-mo/yr
- - $4,200 $1,510
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs