| Assessment Year | 1986 |
|---|---|
| Principal Product | SAUSASGE,LUNCHMEATS,WIENER |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 30,000,000
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $354,546 | 7,939,039 |
kWh
|
$0.045 |
| Natural Gas | $300,308 | 74,218 |
MMBtu
|
$4.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $102,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,600 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $17,856 | $700 | - |
$17,856
-
MMBtu
|
|
| 02 | 2.1222: Install turbulators | $9,291 | $1,200 | - |
$9,291
-
MMBtu
|
|
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $15,058 | $18,000 | - |
$15,058
-
MMBtu
|
|
| 04 | 2.3191: Use demand controller or load shedder | $17,236 | $7,400 |
$17,236
-
kWh
|
- | |
| 05 | 2.2136: Install / repair insulation on steam lines | $6,055 | $14,709 | - |
$6,055
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $5,990 | $4,274 | - |
$5,990
-
MMBtu
|
|
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,985 | $300 |
$7,985
178,781
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $1,126 | $500 |
$1,126
25,205
kWh
|
- | |
| 09 | 2.4312: Improve lubrication practices | $8,116 | - |
$8,116
181,712
kWh
|
- | |
| 10 | 2.2121: Increase amount of condensate returned | $1,616 | $2,600 | - |
$1,616
-
MMBtu
|
|
| 11 | 2.2135: Repair and eliminate steam leaks | $2,009 | $600 | - |
$2,009
-
MMBtu
|
|
| 12 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $2,238 | $1,800 |
$2,238
50,117
kWh
|
- | |
| 13 | 2.7261: Install timers and/or thermostats | $1,187 | $154 |
$183
4,103
kWh
|
$1,004
-
MMBtu
|
|
| 14 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,370 | $1,214 |
$6,370
142,732
kWh
|
- | |
| 15 | 2.2511: Insulate bare equipment | $471 | $291 |
$471
10,551
kWh
|
- | |
| TOTAL RECOMMENDED | $102,604 | $53,742 |
$43,725
593,201
kWh
|
$58,879
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $44,600 | $22,214 |
$17,064
382,181
kWh
|
$27,536
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs