Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product SAUSASGE,LUNCHMEATS,WIENER
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 30,000,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,546 7,939,039
kWh
Natural Gas $300,308 74,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $17,856 $700 - $17,856
-
MMBtu
02 2.1222: Install turbulators $9,291 $1,200 - $9,291
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $15,058 $18,000 - $15,058
-
MMBtu
04 2.3191: Use demand controller or load shedder $17,236 $7,400 $17,236
-
kWh
-
05 2.2136: Install / repair insulation on steam lines $6,055 $14,709 - $6,055
-
MMBtu
06 2.2511: Insulate bare equipment $5,990 $4,274 - $5,990
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,985 $300 $7,985
178,781
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $1,126 $500 $1,126
25,205
kWh
-
09 2.4312: Improve lubrication practices $8,116 - $8,116
181,712
kWh
-
10 2.2121: Increase amount of condensate returned $1,616 $2,600 - $1,616
-
MMBtu
11 2.2135: Repair and eliminate steam leaks $2,009 $600 - $2,009
-
MMBtu
12 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,238 $1,800 $2,238
50,117
kWh
-
13 2.7261: Install timers and/or thermostats $1,187 $154 $183
4,103
kWh
$1,004
-
MMBtu
14 2.7142: Utilize higher efficiency lamps and/or ballasts $6,370 $1,214 $6,370
142,732
kWh
-
15 2.2511: Insulate bare equipment $471 $291 $471
10,551
kWh
-
TOTAL RECOMMENDED $102,604 $53,742 $43,725
593,201
kWh
$58,879
-
MMBtu
TOTAL IMPLEMENTED $44,600 $22,214 $17,064
382,181
kWh
$27,536
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs