ITAC Assessment: UD0220
ITAC logo
ITAC Assessment: UD0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product FABRICATED METAL PRODUCT
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 252
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,996 2,516,706
kWh
Natural Gas $95,746 24,166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,267

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,276 - $7,276
131,301
kWh
- -
02 2.2444: Use hot process fluids to preheat incoming process fluids $6,871 $10,000 - $6,871
-
MMBtu
-
03 3.4151: Minimize water usage $1,991 $300 - - $1,991
04 2.2447: Heat water with exhaust heat $2,530 $2,000 - $1,202
-
MMBtu
$1,328
TOTAL RECOMMENDED $18,668 $12,300 $7,276
131,301
kWh
$8,073
-
MMBtu
$3,319
TOTAL IMPLEMENTED $9,267 $300 $7,276
131,301
kWh
- $1,991
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs