ITAC Assessment: CO0067
ITAC logo
ITAC Assessment: CO0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product HAM,BACON,SAUSAGE,WIENER
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,659 5,080,891
kWh
Natural Gas $167,067 40,713
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,574

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $4,238 $2,400 $4,238
-
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,887 $2,400 $2,887
55,979
kWh
-
03 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $3,563 $2,200 $3,563
69,168
kWh
-
04 2.2136: Install / repair insulation on steam lines $1,266 $828 $691
13,482
kWh
$575
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $5,899 $300 - $5,899
-
MMBtu
06 2.1222: Install turbulators $4,253 - - $4,253
-
MMBtu
07 2.2511: Insulate bare equipment $314 $684 - $314
-
MMBtu
08 2.2121: Increase amount of condensate returned $150 $80 - $150
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,130 $250 $1,130
21,981
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $290 - $290
5,569
kWh
-
11 2.4312: Improve lubrication practices $7,937 - $7,937
154,162
kWh
-
12 2.7261: Install timers and/or thermostats $661 $79 $130
2,638
kWh
$531
-
MMBtu
13 2.7142: Utilize higher efficiency lamps and/or ballasts $905 $1,206 $905
17,585
kWh
-
14 2.2425: Use flue gases to heat process or service water $7,372 $25,000 - $7,372
-
MMBtu
15 2.2447: Heat water with exhaust heat $7,085 $25,000 - $7,085
-
MMBtu
TOTAL RECOMMENDED $47,950 $60,427 $21,771
340,564
kWh
$26,179
-
MMBtu
TOTAL IMPLEMENTED $13,574 $4,943 $6,419
124,854
kWh
$7,155
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs