Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product icecream
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $1
M
to 5
M
# of Employees 162
Plant Area 25,000
ft2
Annual Production 8,100,000
Tgal
Production Hrs. Annual 5,775
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $565,826 11,405,920
kWh
Electricity Demand $137,835 26,049
kW-mo/yr
Electricity Fees $126,079 -
Natural Gas $111,900 21,447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 4.113: Install refrigeration system to cool product $118,003 $560,000 $162,030
2,106,975
kWh
$40,731
-
kW-mo/yr
$(-74,758.0)
-
MMBtu
- $(-10,000.0) -
02 2.8121: Apply for tax-free status for energy purchases $10,099 - - - - - $10,099 -
03 4.652: Replace existing equipment with more suitable substitutes $12,685 $38,000 - - $12,685
-
MMBtu
- - -
04 2.2437: Recover waste heat from equipment $1,127 $6,773 - - $1,127
-
MMBtu
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,421 $1,958 $5,801
82,649
kWh
$2,582
-
kW-mo/yr
$(-1,962.0)
-
MMBtu
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,754 $750 $4,754
67,702
kWh
- - - - -
07 2.4221: Install compressor air intakes in coolest locations $3,270 $500 $3,270
46,600
kWh
- - - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,979 $4,070 $1,979
28,429
kWh
- - - - -
09 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $550 $1,900 - - $550
-
MMBtu
- - -
10 3.4151: Minimize water usage $7,418 $12,500 - - $1,148
-
MMBtu
$3,982
-
Tgal
- $2,288
-
Tgal
TOTAL RECOMMENDED $166,306 $626,451 $177,834
2,332,355
kWh
$43,313
-
kW-mo/yr
$(-61,210.0)
-
MMBtu
$3,982
-
Tgal
$99 $2,288
-
Tgal
TOTAL IMPLEMENTED $28,200 $15,951 $15,804
225,380
kWh
$2,582
-
kW-mo/yr
$(-285.0)
-
MMBtu
- $10,099 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs