Assessment Year | 1998 |
---|---|
Principal Product | icecream |
NAICS |
n/a
|
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $1 M to 5M |
# of Employees | 162 |
Plant Area |
25,000
ft2
|
Annual Production | 8,100,000
Tgal
|
Production Hrs. Annual | 5,775
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $565,826 | 11,405,920 |
kWh
|
$0.050 |
Electricity Demand | $137,835 | 26,049 |
kW-mo/yr
|
$5.29 |
Electricity Fees | $126,079 | - |
|
- |
Natural Gas | $111,900 | 21,447 |
MMBtu
|
$5.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $166,306 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,200 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.113: Install refrigeration system to cool product | $118,003 | $560,000 |
$162,030
2,106,975
kWh
|
$40,731
-
kW-mo/yr
|
$(-74,758.0)
-
MMBtu
|
- | $(-10,000.0) | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $10,099 | - | - | - | - | - | $10,099 | - | |
03 | 4.652: Replace existing equipment with more suitable substitutes | $12,685 | $38,000 | - | - |
$12,685
-
MMBtu
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $1,127 | $6,773 | - | - |
$1,127
-
MMBtu
|
- | - | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,421 | $1,958 |
$5,801
82,649
kWh
|
$2,582
-
kW-mo/yr
|
$(-1,962.0)
-
MMBtu
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,754 | $750 |
$4,754
67,702
kWh
|
- | - | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $3,270 | $500 |
$3,270
46,600
kWh
|
- | - | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,979 | $4,070 |
$1,979
28,429
kWh
|
- | - | - | - | - | |
09 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $550 | $1,900 | - | - |
$550
-
MMBtu
|
- | - | - | |
10 | 3.4151: Minimize water usage | $7,418 | $12,500 | - | - |
$1,148
-
MMBtu
|
$3,982
-
Tgal
|
- |
$2,288
-
Tgal
|
|
TOTAL RECOMMENDED | $166,306 | $626,451 |
$177,834
2,332,355
kWh
|
$43,313
-
kW-mo/yr
|
$(-61,210.0)
-
MMBtu
|
$3,982
-
Tgal
|
$99 |
$2,288
-
Tgal
|
||
TOTAL IMPLEMENTED | $28,200 | $15,951 |
$15,804
225,380
kWh
|
$2,582
-
kW-mo/yr
|
$(-285.0)
-
MMBtu
|
- | $10,099 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs