ITAC Assessment: CO0061
ITAC logo
ITAC Assessment: CO0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CANNED & BOTTLED DRINKS
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 27
Plant Area
n/a
Annual Production 1,200,000
pieces
Production Hrs. Annual 3,900
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,255 810,082
kWh
Natural Gas $42,310 8,886
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,613 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $5,180 $675 - $5,180
-
MMBtu
02 2.7261: Install timers and/or thermostats $2,701 $4,000 - $2,701
-
MMBtu
03 2.7492: Use proper thickness of insulation on building envelope $673 $3,000 - $673
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,929 $1,500 $2,086
7,620
kWh
$(-157.0)
-
MMBtu
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,472 $800 $1,920
24,619
kWh
$552
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $129 $300 - $129
-
MMBtu
07 2.1222: Install turbulators $557 $1,000 - $557
-
MMBtu
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $556 $900 $556
7,034
kWh
-
09 2.4312: Improve lubrication practices $689 - $689
8,792
kWh
-
10 2.2511: Insulate bare equipment $695 $620 - $695
-
MMBtu
11 2.4221: Install compressor air intakes in coolest locations $160 $150 $160
2,052
kWh
-
12 2.6212: Turn off equipment during breaks, reduce operating time $419 $100 $419
5,275
kWh
-
13 2.7142: Utilize higher efficiency lamps and/or ballasts $453 $217 $453
5,862
kWh
-
TOTAL RECOMMENDED $16,613 $13,262 $6,283
61,254
kWh
$10,330
-
MMBtu
TOTAL IMPLEMENTED $10,551 $8,662 $1,302
16,706
kWh
$9,249
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs