Assessment Year | 1986 |
---|---|
Principal Product | BEEF |
NAICS |
n/a
|
SIC | 2011: Meat Packing Plants |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 325,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $516,136 | 10,516,706 |
kWh
|
$0.049 |
Natural Gas | $653,545 | 172,497 |
MMBtu
|
$3.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $101,314 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $73,206 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $29,471 | - | - |
$29,471
-
MMBtu
|
|
02 | 2.1222: Install turbulators | $17,475 | $1,800 | - |
$17,475
-
MMBtu
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,947 | $2,400 |
$4,947
100,821
kWh
|
- | |
04 | 2.4312: Improve lubrication practices | $4,947 | - |
$4,947
100,821
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,412 | $250 |
$1,412
28,722
kWh
|
- | |
06 | 2.7261: Install timers and/or thermostats | $739 | $800 | - |
$739
-
MMBtu
|
|
07 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $28,278 | $15,000 | - |
$28,278
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,469 | $2,240 |
$2,469
50,410
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,576 | $10,350 |
$11,576
235,932
kWh
|
- | |
TOTAL RECOMMENDED | $101,314 | $32,840 |
$25,351
516,706
kWh
|
$75,963
-
MMBtu
|
||
TOTAL IMPLEMENTED | $73,206 | $27,840 |
$15,457
315,064
kWh
|
$57,749
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs