Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product BEEF
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area
n/a
Annual Production 325,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,136 10,516,706
kWh
Natural Gas $653,545 172,497
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,206

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $29,471 - - $29,471
-
MMBtu
02 2.1222: Install turbulators $17,475 $1,800 - $17,475
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,947 $2,400 $4,947
100,821
kWh
-
04 2.4312: Improve lubrication practices $4,947 - $4,947
100,821
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,412 $250 $1,412
28,722
kWh
-
06 2.7261: Install timers and/or thermostats $739 $800 - $739
-
MMBtu
07 2.2449: Recover heat from exhausted steam, hot air or hot water $28,278 $15,000 - $28,278
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,469 $2,240 $2,469
50,410
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $11,576 $10,350 $11,576
235,932
kWh
-
TOTAL RECOMMENDED $101,314 $32,840 $25,351
516,706
kWh
$75,963
-
MMBtu
TOTAL IMPLEMENTED $73,206 $27,840 $15,457
315,064
kWh
$57,749
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs