ITAC Assessment: UF0306
ITAC logo
ITAC Assessment: UF0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Terpene resins
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 45
Plant Area 22,200
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 6,257
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,480 4,422,362
kWh
Electricity Demand $91,712 8,970
kW-mo/yr
Other Gas $107,170 52,323
MMBtu
Other Energy $523,720 53,910
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $978,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Other Energy Savings Water Disposal Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,153 $5,064 $1,105
40,910
kWh
$48
-
kW-mo/yr
- - - -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $1,764 $7,800 $1,764
37,542
kWh
- - - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,327 - $8,327
115,534
kWh
- - - - -
04 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $592,558 $1,120,000 $119,404
4,422,362
kWh
$86,706
-
kW-mo/yr
- $386,448
-
MMBtu
- -
05 3.5311: Recover and reuse waste material $10,048 - $10,048
372,135
kWh
- - - - -
06 4.611: Begin a practice of predictive / preventative maintenance $48,671 $1,074 - - - - $42,408
-
Tgal
$6,263
-
Tgal
07 4.111: Add equipment/ operators to reduce production bottleneck $208,938 $33,980 - - - $208,938
-
MMBtu
- -
08 2.3192: Use fossil fuel powered generator during peak demand periods $107,170 $114,485 - - $107,170
-
MMBtu
- - -
TOTAL RECOMMENDED $978,629 $1,282,403 $140,648
4,988,483
kWh
$86,754
-
kW-mo/yr
$107,170
-
MMBtu
$595,386
-
MMBtu
$42,408
-
Tgal
$6,263
-
Tgal
TOTAL IMPLEMENTED $9,480 $5,064 $9,432
156,444
kWh
$48
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Other Energy Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs