| Assessment Year | 2002 |
|---|---|
| Principal Product | Terpene resins |
| NAICS |
n/a
|
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $50 M to 100M |
| # of Employees | 45 |
| Plant Area |
22,200
ft2
|
| Annual Production | 25,000,000
lb
|
| Production Hrs. Annual | 6,257
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $118,480 | 4,422,362 |
kWh
|
$0.027 |
| Electricity Demand | $91,712 | 8,970 |
kW-mo/yr
|
$10.22 |
| Other Gas | $107,170 | 52,323 |
MMBtu
|
$2.05 |
| Other Energy | $523,720 | 53,910 |
MMBtu
|
$9.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $978,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,480 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Other Energy Savings | Water Disposal Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,153 | $5,064 |
$1,105
40,910
kWh
|
$48
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,764 | $7,800 |
$1,764
37,542
kWh
|
- | - | - | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,327 | - |
$8,327
115,534
kWh
|
- | - | - | - | - | |
| 04 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $592,558 | $1,120,000 |
$119,404
4,422,362
kWh
|
$86,706
-
kW-mo/yr
|
- |
$386,448
-
MMBtu
|
- | - | |
| 05 | 3.5311: Recover and reuse waste material | $10,048 | - |
$10,048
372,135
kWh
|
- | - | - | - | - | |
| 06 | 4.611: Begin a practice of predictive / preventative maintenance | $48,671 | $1,074 | - | - | - | - |
$42,408
-
Tgal
|
$6,263
-
Tgal
|
|
| 07 | 4.111: Add equipment/ operators to reduce production bottleneck | $208,938 | $33,980 | - | - | - |
$208,938
-
MMBtu
|
- | - | |
| 08 | 2.3192: Use fossil fuel powered generator during peak demand periods | $107,170 | $114,485 | - | - |
$107,170
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $978,629 | $1,282,403 |
$140,648
4,988,483
kWh
|
$86,754
-
kW-mo/yr
|
$107,170
-
MMBtu
|
$595,386
-
MMBtu
|
$42,408
-
Tgal
|
$6,263
-
Tgal
|
||
| TOTAL IMPLEMENTED | $9,480 | $5,064 |
$9,432
156,444
kWh
|
$48
-
kW-mo/yr
|
- | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Other Energy Savings | Water Disposal Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs