ITAC Assessment: CO0052
ITAC logo
ITAC Assessment: CO0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ICE CREAM
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $1
M
to 5
M
# of Employees 54
Plant Area
n/a
Annual Production 6,000
Tgal
Production Hrs. Annual 3,952
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,021 6,627,491
kWh
Natural Gas $54,362 11,487
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,900 $300 $2,900
-
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,221 $2,500 $2,027
39,859
kWh
$(-806.0)
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $763 $1,500 $763
14,947
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $852 $300 $852
16,706
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $765 $400 $765
14,947
kWh
-
06 2.4312: Improve lubrication practices $3,842 - $3,842
75,909
kWh
-
07 2.7492: Use proper thickness of insulation on building envelope $111 $250 - $111
-
MMBtu
08 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $73 $30 $73
1,465
kWh
-
09 2.2441: Preheat boiler makeup water with waste process heat $3,902 $4,000 - $3,902
-
MMBtu
10 2.6232: Install set-back timers $1,267 $657 $1,267
24,912
kWh
-
TOTAL RECOMMENDED $15,696 $9,937 $12,489
188,745
kWh
$3,207
-
MMBtu
TOTAL IMPLEMENTED $14,820 $9,287 $11,724
173,798
kWh
$3,096
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs