ITAC Assessment: CO0049
ITAC logo
ITAC Assessment: CO0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ICE MAKING MACHINES
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area
n/a
Annual Production 18,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,290 3,660,610
kWh
Natural Gas $77,896 16,468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $614 $1,050 $614
11,137
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,488 $300 - $1,488
-
MMBtu
03 2.1222: Install turbulators $1,131 $1,000 - $1,131
-
MMBtu
04 2.2437: Recover waste heat from equipment $2,411 $4,000 - $2,411
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,347 $200 $1,347
24,619
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $296 $250 $296
5,275
kWh
-
07 2.3132: Recharge batteries on during off-peak demand periods $3,828 $2,800 $3,828
-
kWh
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,647 $20,000 $15,145
50,703
kWh
$(-3,498.0)
-
MMBtu
09 2.4312: Improve lubrication practices $379 $100 $379
7,034
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $3,284 $2,039 $3,284
59,789
kWh
-
11 2.8122: Use utility controlled power management $16,714 $25,000 $16,714
-
kWh
-
TOTAL RECOMMENDED $43,139 $56,739 $41,607
158,557
kWh
$1,532
-
MMBtu
TOTAL IMPLEMENTED $22,010 $28,700 $21,609
98,768
kWh
$401
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs