Assessment Year | 1995 |
---|---|
Principal Product | Automobile Parts |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
140,000
ft2
|
Annual Production | 150,000
pieces
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $455,573 | 6,830,305 |
kWh
|
$0.067 |
Natural Gas | $79,758 | 14,493 |
MMBtu
|
$5.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $223,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $100,422 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $6,967 | $13,352 |
$6,967
88,511
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,319 | $204 |
$2,319
53,927
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,115 | $14,659 |
$7,115
75,029
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $677 | $1,152 |
$677
19,930
kWh
|
- | - | |
05 | 2.7122: Disconnect ballasts | $553 | $1,400 |
$553
11,430
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,001 | $1,116 |
$1,001
15,826
kWh
|
- | - | |
07 | 2.1321: Replace fossil fuel equipment with electrical equipment | $8,226 | $11,400 |
$9,920
90,270
kWh
|
$(-1,694.0)
-
MMBtu
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $845 | $350 |
$845
12,603
kWh
|
- | - | |
09 | 2.8114: Change rate schedules or other changes in utility service | $110,283 | $250,000 | - | - | $110,283 | |
10 | 3.6112: Use filter and drying oven to reduce sludge volume | $85,495 | $8,000 | - | - | $85,495 | |
TOTAL RECOMMENDED | $223,481 | $301,633 |
$29,397
367,526
kWh
|
$(-1,694.0)
-
MMBtu
|
$195,778 | ||
TOTAL IMPLEMENTED | $100,422 | $36,361 |
$14,927
176,143
kWh
|
- | $85,495 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs