ITAC Assessment: UF0131
ITAC logo
ITAC Assessment: UF0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Automobile Parts
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 140,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 4,550
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $455,573 6,830,305
kWh
Natural Gas $79,758 14,493
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $223,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,422

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $6,967 $13,352 $6,967
88,511
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,319 $204 $2,319
53,927
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,115 $14,659 $7,115
75,029
kWh
- -
04 2.7135: Install occupancy sensors $677 $1,152 $677
19,930
kWh
- -
05 2.7122: Disconnect ballasts $553 $1,400 $553
11,430
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,001 $1,116 $1,001
15,826
kWh
- -
07 2.1321: Replace fossil fuel equipment with electrical equipment $8,226 $11,400 $9,920
90,270
kWh
$(-1,694.0)
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $845 $350 $845
12,603
kWh
- -
09 2.8114: Change rate schedules or other changes in utility service $110,283 $250,000 - - $110,283
10 3.6112: Use filter and drying oven to reduce sludge volume $85,495 $8,000 - - $85,495
TOTAL RECOMMENDED $223,481 $301,633 $29,397
367,526
kWh
$(-1,694.0)
-
MMBtu
$195,778
TOTAL IMPLEMENTED $100,422 $36,361 $14,927
176,143
kWh
- $85,495
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs