ITAC Assessment: CO0044
ITAC logo
ITAC Assessment: CO0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product LANDMOVING & FARM EQUIPMENT
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 18
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 2,184
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,660 614,302
kWh
Natural Gas $39,340 8,285
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,449

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,425 $5,000 $9,748
15,826
kWh
$(-323.0)
-
MMBtu
02 2.7441: Replace broken windows and/or window sash $2,324 $560 - $2,324
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,668 $100 $1,668
18,757
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $368 $300 $477
5,275
kWh
$(-109.0)
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $128 $200 - $128
-
MMBtu
06 2.7492: Use proper thickness of insulation on building envelope $2,521 $4,257 - $2,521
-
MMBtu
07 2.7492: Use proper thickness of insulation on building envelope $836 $1,714 - $836
-
MMBtu
08 2.1321: Replace fossil fuel equipment with electrical equipment $962 $600 $(-113.0)
(-1,172)
kWh
$1,075
-
MMBtu
09 2.7261: Install timers and/or thermostats $6,495 $122 $175
2,052
kWh
$6,320
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,073 $1,930 $2,073
23,447
kWh
-
TOTAL RECOMMENDED $26,800 $14,783 $14,028
64,185
kWh
$12,772
-
MMBtu
TOTAL IMPLEMENTED $11,449 $1,382 $1,730
19,637
kWh
$9,719
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs