| Assessment Year | 1985 |
|---|---|
| Principal Product | PRINTED BUSINESS FORMS |
| NAICS |
n/a
|
| SIC | 2782: Blankbooks, Looseleaf Binders and Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
n/a
|
| Annual Production | 10,800
ton
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $125,230 | 2,242,087 |
kWh
|
$0.056 |
| Natural Gas | $15,423 | 3,157 |
MMBtu
|
$4.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,719 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,624 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,095 | $250 |
$3,095
55,393
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $963 | $1,000 |
$963
17,292
kWh
|
- | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $1,043 | $4,000 | - |
$1,043
-
MMBtu
|
|
| 04 | 2.7212: Install or upgrade insulation on hvac distribution systems | $327 | $200 | - |
$327
-
MMBtu
|
|
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $250 | $100 |
$250
4,396
kWh
|
- | |
| 06 | 2.3132: Recharge batteries on during off-peak demand periods | $888 | $200 |
$888
-
kWh
|
- | |
| 07 | 2.7492: Use proper thickness of insulation on building envelope | $298 | $600 | - |
$298
-
MMBtu
|
|
| 08 | 2.7211: Clean and maintain refrigerant condensers and towers | $231 | $300 |
$231
4,103
kWh
|
- | |
| 09 | 2.7261: Install timers and/or thermostats | $4,196 | $100 |
$4,196
75,029
kWh
|
- | |
| 10 | 2.7221: Lower temperature during the winter season and vice-versa | $994 | $100 |
$994
17,878
kWh
|
- | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,434 | $596 |
$7,434
133,060
kWh
|
- | |
| TOTAL RECOMMENDED | $19,719 | $7,446 |
$18,051
307,151
kWh
|
$1,668
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,624 | $6,046 |
$14,956
267,585
kWh
|
$1,668
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs