| Assessment Year | 2007 |
|---|---|
| Principal Product | Power Transformers |
| NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
| SIC | 3612: Power, Distribution, and Specialty Transformers |
| Sales Range | $10 M to 50M |
| # of Employees | 392 |
| Plant Area |
110,000
ft2
|
| Annual Production | 1,000
pieces
|
| Production Hrs. Annual | 6,266
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $375,162 | 5,249,520 |
kWh
|
$0.071 |
| Electricity Demand | $103,192 | 13,855 |
kW-mo/yr
|
$7.45 |
| Electricity Fees | $74,620 | - |
|
- |
| Natural Gas | $166,640 | 16,671 |
MMBtu
|
$10.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $184,474 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,878 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $42,022 | $5,254 | - | - |
$42,022
-
MMBtu
|
- | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $41,941 | $120 |
$34,968
489,060
kWh
|
$6,973
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,946 | $68,250 |
$23,297
325,832
kWh
|
$4,649
-
kW-mo/yr
|
- | - | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $31,234 | $5,254 |
$26,038
364,171
kWh
|
$5,196
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,543 | $1,074 |
$10,797
151,013
kWh
|
$5,746
-
kW-mo/yr
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $10,741 | $5,000 |
$8,953
125,212
kWh
|
$1,788
-
kW-mo/yr
|
- | - | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,315 | $2,627 |
$6,932
96,949
kWh
|
$1,383
-
kW-mo/yr
|
- | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,220 | $30 |
$1,224
17,122
kWh
|
$996
-
kW-mo/yr
|
- | - | |
| 09 | 4.821: Pay bills on time to avoid late fees | $1,658 | $300 | - | - | - | $1,658 | |
| 10 | 2.6218: Turn off equipment when not in use | $1,203 | $240 |
$1,003
14,023
kWh
|
$200
-
kW-mo/yr
|
- | - | |
| 11 | 2.4323: Use optimum size and capacity equipment | $651 | $3,010 |
$509
7,123
kWh
|
$142
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $184,474 | $91,159 |
$113,721
1,590,505
kWh
|
$27,073
-
kW-mo/yr
|
$42,022
-
MMBtu
|
$1,658 | ||
| TOTAL IMPLEMENTED | $3,878 | $330 |
$1,224
17,122
kWh
|
$996
-
kW-mo/yr
|
- | $1,658 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs