ITAC Assessment: MI0150
ITAC logo
ITAC Assessment: MI0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Power Transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 392
Plant Area 110,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 6,266
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $375,162 5,249,520
kWh
Electricity Demand $103,192 13,855
kW-mo/yr
Electricity Fees $74,620 -
Natural Gas $166,640 16,671
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $184,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $42,022 $5,254 - - $42,022
-
MMBtu
-
02 2.7221: Lower temperature during the winter season and vice-versa $41,941 $120 $34,968
489,060
kWh
$6,973
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $27,946 $68,250 $23,297
325,832
kWh
$4,649
-
kW-mo/yr
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $31,234 $5,254 $26,038
364,171
kWh
$5,196
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,543 $1,074 $10,797
151,013
kWh
$5,746
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $10,741 $5,000 $8,953
125,212
kWh
$1,788
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $8,315 $2,627 $6,932
96,949
kWh
$1,383
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $2,220 $30 $1,224
17,122
kWh
$996
-
kW-mo/yr
- -
09 4.821: Pay bills on time to avoid late fees $1,658 $300 - - - $1,658
10 2.6218: Turn off equipment when not in use $1,203 $240 $1,003
14,023
kWh
$200
-
kW-mo/yr
- -
11 2.4323: Use optimum size and capacity equipment $651 $3,010 $509
7,123
kWh
$142
-
kW-mo/yr
- -
TOTAL RECOMMENDED $184,474 $91,159 $113,721
1,590,505
kWh
$27,073
-
kW-mo/yr
$42,022
-
MMBtu
$1,658
TOTAL IMPLEMENTED $3,878 $330 $1,224
17,122
kWh
$996
-
kW-mo/yr
- $1,658
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs