ITAC Assessment: OR0341
ITAC logo
ITAC Assessment: OR0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Sound absorbing Materials
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 213
Plant Area 345,600
ft2
Annual Production 648,500
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,886 23,245,311
kWh
Electricity Demand $105,744 528,720
kW-mo/yr
Electricity Fees $7,681 -
Natural Gas $2,053,252 840,030
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,057,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $845,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings Primary Product Savings
01 3.2124: Convert to air assisted / airless paint guns $661,700 $72,000 - - - - - - - $661,700 - -
02 3.4113: Treat and reuse rinse waters $162,000 $183,000 - - - $105,000
-
Tgal
$1,600
-
lb
- $13,900 - $41,500
-
Tgal
-
03 3.5217: Reuse / recycle/ sell paper products $5,880 - - - - - $5,880
-
lb
- - - - -
04 3.5311: Recover and reuse waste material $1,300 $6,600 - - - - $740
-
lb
- - $560 - -
05 4.446: Automate finishing process $106,000 $106,500 - - - - - $103,000 $3,000 - - -
06 4.642: Install sensors to detect and avoid jams $4,930 $4,250 - - - - - - - - - $4,930
07 2.2437: Recover waste heat from equipment $93,630 $40,200 $(-18,800.0)
(-643,025)
kWh
$(-2,970.0)
-
kW-mo/yr
$115,400
-
MMBtu
- - - - - - -
08 2.6218: Turn off equipment when not in use $5,610 $500 - - $5,610
-
MMBtu
- - - - - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,570 $8,000 $14,310
488,570
kWh
$2,260
-
kW-mo/yr
- - - - - - - -
TOTAL RECOMMENDED $1,057,620 $421,050 $(-4,490.0)
(-154,455)
kWh
$(-710.0)
-
kW-mo/yr
$121,010
-
MMBtu
$105,000
-
Tgal
$8,220
-
lb
$103,000 $16,900 $662,260 $41,500
-
Tgal
$4,930
TOTAL IMPLEMENTED $845,200 $267,250 $14,310
488,570
kWh
$2,260
-
kW-mo/yr
- $105,000
-
Tgal
$1,600
-
lb
- $13,900 $661,700 $41,500
-
Tgal
$4,930
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs