ITAC Assessment: CO0019
ITAC logo
ITAC Assessment: CO0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MOBILE HOMES
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 300
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,390 366,940
kWh
Natural Gas $21,151 4,473
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,101

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $568 $353 $568
8,206
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,533 $3,200 - $1,533
-
MMBtu
03 2.7233: Use properly designed and sized hvac equipment $1,278 $2,000 $1,278
18,464
kWh
-
04 2.7261: Install timers and/or thermostats $4,121 $218 $162
2,345
kWh
$3,959
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,572 $4,000 $3,630
52,462
kWh
$(-1,058.0)
-
MMBtu
06 2.2437: Recover waste heat from equipment $657 $1,200 - $657
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $568 $30 $568
8,206
kWh
-
TOTAL RECOMMENDED $11,297 $11,001 $6,206
89,683
kWh
$5,091
-
MMBtu
TOTAL IMPLEMENTED $2,101 $3,553 $568
8,206
kWh
$1,533
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs