| Assessment Year | 1985 |
|---|---|
| Principal Product | MILK,JUICES,CHEESE,CREAM |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 108,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $210,313 | 4,405,041 |
kWh
|
$0.048 |
| Natural Gas | $130,642 | 25,743 |
MMBtu
|
$5.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,871 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,474 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,955 | $1,548 |
$2,955
61,841
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,070 | $300 | - |
$7,070
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $858 | $640 | - |
$858
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $380 | $300 |
$380
7,913
kWh
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $121 | $219 | - |
$121
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $149 | $170 | - |
$149
-
MMBtu
|
|
| 07 | 2.3191: Use demand controller or load shedder | $3,046 | $13,000 |
$3,046
-
kWh
|
- | |
| 08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $235 | $200 |
$235
4,982
kWh
|
- | |
| 09 | 2.2444: Use hot process fluids to preheat incoming process fluids | $7,666 | $5,000 | - |
$7,666
-
MMBtu
|
|
| 10 | 2.1222: Install turbulators | $5,512 | $1,000 | - |
$5,512
-
MMBtu
|
|
| 11 | 2.2441: Preheat boiler makeup water with waste process heat | $1,879 | $2,500 | - |
$1,879
-
MMBtu
|
|
| TOTAL RECOMMENDED | $29,871 | $24,877 |
$6,616
74,736
kWh
|
$23,255
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,474 | $15,688 |
$6,616
74,736
kWh
|
$858
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs