ITAC Assessment: CO0016
ITAC logo
ITAC Assessment: CO0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MILK,JUICES,CHEESE,CREAM
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 108,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,313 4,405,041
kWh
Natural Gas $130,642 25,743
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,474

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,955 $1,548 $2,955
61,841
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $7,070 $300 - $7,070
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $858 $640 - $858
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $380 $300 $380
7,913
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $121 $219 - $121
-
MMBtu
06 2.2511: Insulate bare equipment $149 $170 - $149
-
MMBtu
07 2.3191: Use demand controller or load shedder $3,046 $13,000 $3,046
-
kWh
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $235 $200 $235
4,982
kWh
-
09 2.2444: Use hot process fluids to preheat incoming process fluids $7,666 $5,000 - $7,666
-
MMBtu
10 2.1222: Install turbulators $5,512 $1,000 - $5,512
-
MMBtu
11 2.2441: Preheat boiler makeup water with waste process heat $1,879 $2,500 - $1,879
-
MMBtu
TOTAL RECOMMENDED $29,871 $24,877 $6,616
74,736
kWh
$23,255
-
MMBtu
TOTAL IMPLEMENTED $7,474 $15,688 $6,616
74,736
kWh
$858
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs