Assessment Year | 1984 |
---|---|
Principal Product | FABRICATED STEEL |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 7,000
ton
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $19,434 | 284,291 |
kWh
|
$0.068 |
Natural Gas | $9,973 | 2,044 |
MMBtu
|
$4.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,564 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $350 | $300 |
$350
5,275
kWh
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $105 | $300 | - |
$105
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $356 | $20 |
$356
5,275
kWh
|
- | |
04 | 2.7492: Use proper thickness of insulation on building envelope | $820 | $1,939 | - |
$820
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $288 | $150 | - |
$288
-
MMBtu
|
|
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,708 | $5,000 |
$2,708
29,601
kWh
|
- | |
07 | 2.7261: Install timers and/or thermostats | $347 | $125 |
$86
2,638
kWh
|
$261
-
MMBtu
|
|
08 | 2.3521: Reduce load on electrical conductor to reduce heating losses | $134 | $200 |
$134
2,052
kWh
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $164 | $60 |
$164
2,345
kWh
|
- | |
TOTAL RECOMMENDED | $5,272 | $8,094 |
$3,798
47,186
kWh
|
$1,474
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,564 | $3,094 |
$1,090
17,585
kWh
|
$1,474
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs