| Assessment Year | 1984 |
|---|---|
| Principal Product | FABRICATED STEEL |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
n/a
|
| Annual Production | 7,000
ton
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $19,434 | 284,291 |
kWh
|
$0.068 |
| Natural Gas | $9,973 | 2,044 |
MMBtu
|
$4.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,564 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $350 | $300 |
$350
5,275
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $105 | $300 | - |
$105
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $356 | $20 |
$356
5,275
kWh
|
- | |
| 04 | 2.7492: Use proper thickness of insulation on building envelope | $820 | $1,939 | - |
$820
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $288 | $150 | - |
$288
-
MMBtu
|
|
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,708 | $5,000 |
$2,708
29,601
kWh
|
- | |
| 07 | 2.7261: Install timers and/or thermostats | $347 | $125 |
$86
2,638
kWh
|
$261
-
MMBtu
|
|
| 08 | 2.3521: Reduce load on electrical conductor to reduce heating losses | $134 | $200 |
$134
2,052
kWh
|
- | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $164 | $60 |
$164
2,345
kWh
|
- | |
| TOTAL RECOMMENDED | $5,272 | $8,094 |
$3,798
47,186
kWh
|
$1,474
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,564 | $3,094 |
$1,090
17,585
kWh
|
$1,474
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs