ITAC Assessment: CO0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product SPORT RACQUETS
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,357 3,808,031
kWh
Natural Gas $93,696 19,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,648

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $35,148 $10,260 $35,148
732,122
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $8,158 $300 - $8,158
-
MMBtu
03 2.2111: Install steam trap $1,507 $254 - $1,507
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $814 $250 $1,434
29,894
kWh
$(-620.0)
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $1,061 - $1,061
22,274
kWh
-
06 2.3212: Optimize plant power factor $9,850 $10,000 $9,850
-
kWh
-
07 2.7261: Install timers and/or thermostats $10,932 $1,557 $1,134
23,740
kWh
$9,798
-
MMBtu
TOTAL RECOMMENDED $67,470 $22,621 $48,627
808,030
kWh
$18,843
-
MMBtu
TOTAL IMPLEMENTED $48,648 $12,071 $37,343
778,136
kWh
$11,305
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs