| Assessment Year | 2023 |
|---|---|
| Principal Product | Plastic Pipes, Valves and Fittings |
| NAICS | 332996: Fabricated Pipe and Pipe Fitting Manufacturing |
| SIC | 3498: Fabricated Pipe and Pipe Fittings |
| Sales Range | $100 M to 500M |
| # of Employees | 120 |
| Plant Area |
110,000
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $84,846 | 661,183 |
kWh
|
$0.13 | |
| Electricity Demand | $87,807 | 4,877 |
kW-mo/yr
|
$18.00 | |
| Natural Gas | $4,025 | 221 |
MMBtu
|
$18.21 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,059 | 320 |
Tgal
|
$15.81 | |
| Water Disposal | $1,083 | 320 |
Tgal
|
$3.38 | |
| TOTAL YEARLY COSTS | $182,820 | ||||
| RECOMMENDED SAVINGS* | $46,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7232: Replace existing hvac unit with high efficiency model | $13,010 | $43,210 |
$13,010
49,056
kWh
|
- | |
| 02 | 2.4224: Upgrade controls on compressors | $10,578 | $2,500 |
$5,743
44,760
kWh
|
$4,835
-
kW-mo/yr
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,619 | $300 |
$4,671
36,405
kWh
|
$2,948
-
kW-mo/yr
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,563 | $3,850 |
$3,321
25,884
kWh
|
$1,242
-
kW-mo/yr
|
|
| 05 | 2.7134: Use photocell controls | $3,983 | $2,500 |
$2,075
16,171
kWh
|
$1,908
-
kW-mo/yr
|
|
| 06 | 2.6218: Turn off equipment when not in use | $3,548 | - |
$3,548
27,652
kWh
|
- | |
| 07 | 2.7135: Install occupancy sensors | $2,177 | $2,500 |
$1,700
13,248
kWh
|
$477
-
kW-mo/yr
|
|
| 08 | 2.4239: Eliminate or reduce compressed air usage | $1,149 | $500 |
$1,149
8,952
kWh
|
- | |
| TOTAL RECOMMENDED | $46,627 | $55,360 |
$35,217
222,128
kWh
|
$11,410
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs