ITAC Assessment: MO0214
ITAC logo
ITAC Assessment: MO0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Color Separations
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 365
Plant Area 104,654
ft2
Annual Production 254,069
units
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,739 2,721,571
kWh
Electricity Demand $12,047 603
kW-mo/yr
Electricity Fees $15,284 -
Natural Gas $6,891 1,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,859

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.432: Cross-train personnel to avoid lost time $12,968 $25,000 - - - $12,968
02 4.514: Re-arrange equipment layout to reduce handling costs $5,861 $12,500 - - - $5,861
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,219 $9,884 $10,691
192,849
kWh
$528
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,779 $1,126 $4,553
82,063
kWh
$226
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $617 $1,104 $593
10,844
kWh
$24
-
kW-mo/yr
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,440 $5,240 - - $4,440
-
lb
-
07 3.7196: Use re-usable filters $1,061 $1,515 - - $1,061
-
lb
-
TOTAL RECOMMENDED $40,945 $56,369 $15,837
285,756
kWh
$778
-
kW-mo/yr
$5,501
-
lb
$18,829
TOTAL IMPLEMENTED $21,859 $23,510 $15,244
274,912
kWh
$754
-
kW-mo/yr
- $5,861
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs