| Assessment Year | 2019 |
|---|---|
| Principal Product | Beans |
| NAICS | 311991: Perishable Prepared Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 20 |
| Plant Area |
353,325
ft2
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 3,757
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $32,352 | 763,120 |
kWh
|
$0.042 | |
| LPG | $1,250 | 471 |
MMBtu
|
$2.66 | |
| Waste Disposal Costs | |||||
| Water Usage | $10,200 | 2,626 |
Tgal
|
$3.88 | |
| TOTAL YEARLY COSTS | $43,801 | ||||
| RECOMMENDED SAVINGS* | $3,806 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $442 | $300 |
$442
10,525
kWh
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $79 | $38 |
$79
1,880
kWh
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $472 | $295 |
$472
11,250
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $204 | $412 |
$204
4,861
kWh
|
|
| 05 | 2.7261: Install timers and/or thermostats | $217 | $170 |
$217
5,170
kWh
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,392 | $1,030 |
$2,392
56,973
kWh
|
|
| TOTAL RECOMMENDED | $3,806 | $2,245 |
$3,806
90,658
kWh
|
||
| TOTAL IMPLEMENTED | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs