ITAC Assessment: BS0129
ITAC logo
ITAC Assessment: BS0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Corrugated Containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 112
Plant Area 207,000
ft2
Annual Production 1,400,000
thousand feet
Production Hrs. Annual 4,992
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $410,867 7,591,200
kWh
Electricity Fees $480 -
Natural Gas $32,172 73,255
MMBtu
TOTAL YEARLY COSTS $443,519
RECOMMENDED SAVINGS* $69,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,020 $1,102 $17,020
314,484
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $4,961 $6,744 $4,961
91,669
kWh
-
03 2.2414: Use waste heat from hot flue gases to preheat $7,707 $13,390 - $7,707
-
MMBtu
04 2.4224: Upgrade controls on compressors $6,885 $10,080 $6,885
127,215
kWh
-
05 2.4133: Use most efficient type of electric motors $18,337 $34,309 $18,337
338,821
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,874 $4,056 $3,874
71,579
kWh
-
07 2.6231: Utilize controls to operate equipment only when needed $7,558 $22,950 $7,558
139,651
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,857 $712 $1,857
34,316
kWh
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,745 $450 $1,745
32,245
kWh
-
TOTAL RECOMMENDED $69,944 $93,793 $62,237
1,149,980
kWh
$7,707
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs