ITAC Assessment: BS0104
ITAC logo
ITAC Assessment: BS0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Window Frames/Door Frames/Molding
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $50
M
to 100
M
# of Employees 430
Plant Area 500,000
ft2
Annual Production 34,000,000
thousand feet
Production Hrs. Annual 7,464
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,070,790 22,707,155
kWh
Electricity Demand $317,034 48,269
kW-mo/yr
Electricity Fees $4,460 -
Natural Gas $177,296 28,715
MMBtu
TOTAL YEARLY COSTS $1,569,580
RECOMMENDED SAVINGS* $231,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $120,755 $55,860 $120,755
2,561,090
kWh
- -
02 2.4322: Use or replace with energy efficient substitutes $55,510 $60,400 $55,510
1,177,310
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $36,306 $482 $36,306
770,017
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,223 $948 $4,223
89,568
kWh
- -
05 2.4224: Upgrade controls on compressors $5,010 $7,576 $3,898
82,668
kWh
$1,112
-
kW-mo/yr
-
06 3.1161: Eliminate/reduce an operation $72 $169 $72
1,519
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $444 $990 $444
9,423
kWh
- -
08 2.6231: Utilize controls to operate equipment only when needed $2,363 $968 $2,363
50,113
kWh
- -
09 2.7135: Install occupancy sensors $338 $198 $338
7,166
kWh
- -
10 2.7243: Improve air circulation with destratification fans / other methods $6,506 $20,241 $(-323.0)
(-6,841)
kWh
- $6,829
-
MMBtu
TOTAL RECOMMENDED $231,527 $147,832 $223,586
4,742,033
kWh
$1,112
-
kW-mo/yr
$6,829
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs